The EFFICACE project follows on from Eolink’s successful production of a prototype 1/10th scale floating 12 MW wind turbine, which was connected to the grid, equipped with instruments and tested at sea in 2018 and 2019.

The current project aims to speed up the commercial rollout of the EOLINK 12 MW floating wind turbine.

It will establish all the necessary pre-construction engineering for a 3/4 scale, 5 MW demonstrator.

This innovation is based on the ability to increase the unit power of wind turbines by replacing a single tower, which can suffer from vibration and bending moment, with a supporting pyramid. Traditional turbine designs face technological obstacles associated with resonance from vibrations and with interaction between the blades and the tower.

EOLINK’s tests appear to demonstrate that mounting a 12 MW turbine on a 66 m-long floater  is feasible, thus allowing the structure’s weight and cost to be significantly reduced. Furthermore, this concept allows for longer blades because the conventional design constraint of proximity to the vertical tower no longer applies.

These competitive advantages will  bring generation costs in at around €50-70/MWh in 2025 and €35-40/MWh in 2030.

Partner
COM_PROJECTS_CATEGORIE_PARTNER_ENTREPRISES
  • - Eolink, Plouzané  [Project Developer]
Funder
Ademe
Labelisation
28/06/2019
Overall budget
986 K€